Temporary security can cover a short project phase, weather delay, shutdown, equipment delivery period or other defined window of increased exposure.

Virginia DCJS #11-637124/7 Coverage RequestsStatewide Virginia Service
  • Requests any hour Nights, weekends and holidays included.
  • Named escalation Escalation contacts fixed before an officer arrives.
  • DCJS #11-6371 Licensed Virginia security business.
  • Unarmed officers Uniformed officers, no firearms on any assignment.

Temporary security can cover a short project phase, weather delay, shutdown, equipment delivery period or other defined window of increased exposure.

Why this assignment is different

Temporary security can cover a short project phase, weather delay, shutdown, equipment delivery period or other defined window of increased exposure.

The right approach depends on the project phase, site footprint, active access points, work schedule, surrounding environment, items being protected and client reporting requirements.

Security planning components

Define when coverage starts and ends, where the officer or patrol is positioned, which areas must be checked, who may enter after hours, how exceptions are handled and who receives escalation.

For multi-phase projects, revisit the post orders when gates move, structures become enclosed, materials are staged differently or normal work hours change.

Reporting and supervision

Activity reporting should reflect the actual post orders. Clients may request visitor logs, patrol observations, incident reports, photographs where appropriate and clear escalation to project contacts.

Plan the assignment before coverage begins

For faster planning, provide the site address, requested start time, coverage hours, number of posts or access points, reporting expectations, site contacts and any assignment-specific instructions. NESF can use that information to discuss an appropriate staffing and reporting approach.

From a phone call to an officer on post.

  1. Tell us the site Address, hours, access points, and what the officer is watching.
  2. Post orders and rate Written post orders and a confirmed rate before anyone starts.
  3. Officers on post Officers work the orders, log the shift, escalate to your contact.

Need Security Coverage in Virginia?

Tell NESF the site location, service needed, desired start time, schedule and assignment requirements. Our team can discuss coverage options and next steps.


Assignment detail

What a temporary jobsite assignment covers in Virginia

What the assignment covers

Coverage for a defined window on a construction project rather than an ongoing schedule. Typical windows include the weeks around a high-value delivery, a weather or permitting delay that leaves a site idle, a work stoppage, a mobilization or demobilization period, or the gap when fencing is down or a gate is being replaced. Post orders are written for that window, coverage ends on the agreed date, and the client receives shift reports covering the whole period.

When this is the right fit

Choose this when the exposure has a known start and end. Long-Term Construction Security fits coverage across the project life. Weekend Construction Security and Holiday Construction Security fit recurring or calendar-driven gaps. If the trigger is a theft or incident that already happened and coverage is needed now, use Emergency Construction Site Security.

What to have ready

Have the site address, the exact start and end dates and daily hours, the reason for the window so post orders match it, gate access and keys, what is on site during the period, whether the end date may move with the schedule, and the superintendent or project contact.


Common questions

Questions about temporary jobsite in Virginia

Our delivery slipped a week. Can the coverage window move?

Tell NESF as soon as you know, because officers are scheduled in advance and moving a window is a scheduling matter rather than a same-day adjustment. Short notice may still be workable depending on location and staffing, but it will not be assumed. Schedule slippage is normal on construction projects, so flag it early rather than at the end of a shift.

Our fence is coming down for a phase change. Is that worth covering?

Often yes, because the perimeter is what most jobsite security depends on and its absence is a known, dated exposure rather than a general worry. Tell NESF how long the opening will exist, where it is, and what is inside the affected area, and coverage can be concentrated on that boundary for exactly as long as it is open.

Coverage request

Request coverage for this site

Tell us the site, the hours you need covered and when it starts. If the coverage is needed today, calling 703-869-6213 is faster than this form.

Call 703-869-6213 instead
  • Virginia DCJS #11-6371 · unarmed uniformed officers
  • Written site-specific post orders and documented reporting on every shift
  • Requests taken at any hour, including nights, weekends and holidays