Hot Work Fire Watch Checklist (Printable)
Last updated · How we write and check our guides
A one-job checklist for welding, cutting, grinding, brazing and torch-applied roofing. Work through it before the first spark, keep it at the work area while the job runs, and sign it off when the watch is released.
Tell us the site, the hours you need covered and how officers get in. That is enough to scope it.
- Reported every shift Written activity reporting on each shift.
- Requests any hour Nights, weekends and holidays included.
- Named escalation Escalation contacts fixed before an officer arrives.
- DCJS #11-6371 Licensed Virginia security business.
This checklist is a working aid, not a legal standard and not a hot work permit. In Virginia, hot work is covered by Chapter 35, Welding and Other Hot Work, of the International Fire Code as adopted into the Virginia Statewide Fire Prevention Code (SFPC). Virginia’s amendments to that chapter send hot work permits to SFPC Section 107.2, under which the fire official may require an operational permit for hot work. Your hot work permit and the fire official (the authority having jurisdiction) control what is required on your site, including how the fire watch is carried out and when it ends. If either gives you a different form or extra steps, follow theirs.
Hot work fire watch checklist
| Site name and address | |
|---|---|
| Exact work location (building, floor, room, roof area) | |
| Type of hot work (welding, cutting, grinding, brazing, torch roofing, other) | |
| Contractor and hot work operator | |
| Permit number, issued by (name) and date | |
| Permit valid from / to (date and time) | |
| Post-work fire watch period written on the permit or set by the fire official | |
| Fire official’s instructions, if any (name, office, date) | |
| Site contact and phone |
Before work starts
| Check | Yes / No / N/A | Notes | Initials |
|---|---|---|---|
| Hot work permit issued by the authorized person and kept at the work area, available for the fire official to review | |||
| Pre-hot-work check completed and a report of it kept at the work site | |||
| Combustibles moved away from the work, or covered with approved fire-resistant covers where they cannot be moved | |||
| Floor openings, wall penetrations, gaps, ducts and shafts that sparks could reach are covered or sealed | |||
| Spaces above, below and on the far side of walls, decks and partitions checked for combustibles, and access to them arranged | |||
| Fire extinguisher of the right type at the work area, charged, tagged and inspected | |||
| Sprinkler status known (in service or impaired). If impaired, the fire official’s approval for hot work is noted | |||
| Fire alarm and detection status known; any precautions for detectors in the work area handled by the alarm company or building engineer | |||
| Fire watch assigned by name, briefed on the permit, and trained to use the extinguisher and sound the alarm | |||
| Additional fire watch personnel assigned where one person cannot see every exposed area | |||
| Emergency contacts posted: 911, site contact, permit authorizer, alarm monitoring company | |||
| Nearest fire alarm pull station, exits and phone or radio located and working |
During work
| Check | Yes / No / N/A | Notes | Initials |
|---|---|---|---|
| Fire watch stays at the work area with the extinguisher within reach and has no other duties | |||
| Work stays inside the location and time window on the permit | |||
| Sparks, slag and heat watched where they land, including below, beside and behind the work | |||
| Covers and opening seals still in place; nothing new moved into the area | |||
| Exits and paths to the extinguisher and pull station kept clear | |||
| Work stopped if conditions change (new combustibles, wind, a covered opening exposed, sprinklers taken out of service) | |||
| Any fire or smoke: alarm sounded, 911 called, site contact notified, and time and actions written below |
After work stops
| Check | Yes / No / N/A | Notes | Initials |
|---|---|---|---|
| Time hot work ended recorded | |||
| Fire watch continued for the period the permit or fire official requires | |||
| Work area, adjoining spaces and the far side of walls, floors and decks checked for smoke, heat, odor or smoldering material | |||
| Any follow-up monitoring the permit requires arranged and handed to a named person | |||
| Detector precautions removed and fire protection returned to its normal condition by the responsible party | |||
| Permit closed out and returned to the permit authorizer |
Notes and incidents
| Time | Area | What was seen | Action taken / who was notified | Initials |
|---|---|---|---|---|
Sign-off
| Role | Printed name | Signature | Date and time |
|---|---|---|---|
| Permit authorizer (pre-work check complete) | |||
| Hot work operator | |||
| Fire watch (start of watch) | |||
| Fire watch (end of watch, no smoke, heat or fire found) | |||
| Permit authorizer or fire official (watch released) |
How to use this checklist
- One checklist per permit: start a new sheet for each permit and each work location. If crews work in two areas at once, each area gets its own fire watch and its own sheet.
- Fill in the top table first: copy the post-work watch period straight from the permit or the fire official’s instructions. If it is blank or unclear, ask the permit authorizer before work starts.
- Write what you saw: “Deck underside at grid C-4 checked, no heat or smoke” is more useful than “OK” if anyone reviews the job later.
- Keep it with the permit: file the signed checklist with the closed permit and the site’s fire protection records. If you also need a running log of rounds or shift changes, use our fire watch log template alongside it.
Code and industry references
Virginia’s amendments to the hot work chapter of the SFPC are published in the Virginia Administrative Code at 13VAC5-52-400, IFC Chapter 35 Welding and Other Hot Work. For when a hot work fire watch is required, how it is staffed, and how OSHA rules and NFPA 51B fit in, see our hot work fire watch page.
For jobsites where hot work is one of several fire risks, see construction fire watch.
Hot work fire watch checklist questions
Is this checklist a hot work permit?
No. A hot work permit is issued by the person your hot work program authorizes, and the fire official may also require an operational permit for hot work under the SFPC. This checklist helps the fire watch and the crew confirm the permit’s conditions are met and record what happened. Keep it with the permit, not in place of it.
How long does the fire watch continue after hot work ends?
For the period your permit or the fire official requires. That period can differ by job, and the fire official or your hot work program can extend it, so write it in the top table before work starts and do not release the watch until the permit authorizer or fire official says the area is clear.
How long should we keep the signed checklist?
Follow your permit, your hot work program and the fire official. File the signed sheet with the closed permit so it can be found if the job is reviewed, and ask the fire official or your insurer if you are unsure how long to keep it.
Can the hot work operator also be the fire watch?
Plan for a separate person. The fire watch needs to watch where sparks and heat travel while the operator is focused on the work, and a second person is needed where one cannot see every exposed area. Follow your permit and the fire official if they set staffing.
Can NESF provide the fire watch and fill out this checklist?
Yes. North Eastern Security Force (NESF), a Virginia DCJS-licensed company (#11-6371), provides unarmed, uniformed fire watch officers who stay at the work area, keep a written record and follow your permit and the fire official’s instructions. Our officers do not issue permits or service fire protection systems. Call 703-869-6213, answered 24/7.
What happens after you call.
- Tell us the site Address, hours, access points, and what the officer is watching.
- Post orders and rate Written post orders and a confirmed rate before anyone starts.
- Officers on post Officers on post, activity logged, escalation to your named contact.
Coverage is scheduled around the site, the hours and officer availability.