Industry Security

Security Guards for General Contractors in Virginia

NESF provides security guard, construction security, access control and fire watch solutions for general contractors throughout Virginia.

Tell us the site, the hours you need covered and how officers get in. That is enough to scope it.

Virginia DCJS #11-637124/7 AvailabilityStatewide Virginia CoverageRated 4.5 on Google (16 reviews) (opens in a new tab)
  • DCJS #11-6371 Licensed Virginia security business.
  • Unarmed officers Uniformed officers, no firearms on any assignment.
  • Statewide Virginia Scheduled anywhere in the Commonwealth.
  • Reported every shift Written activity reporting on each shift.

General contractors need a jobsite that stays controlled after the crews leave and a gate that knows who belongs on it. North Eastern Security Force provides unarmed, uniformed officers for Virginia construction sites, covering gate and access control, site patrols, and fire watch staffed to the fire official’s instructions, under DCJS license #11-6371.

Who arranges security on a general contractor’s project

Jobsite security is set up by the people who answer for the site. That can be the superintendent who runs the gate and the schedule, the project manager who owns the budget, the safety manager who writes the site rules, or an owner’s representative or procurement team issuing a scope for bid. Each needs something different. The superintendent wants to know who came through the gate. The safety manager wants hazards written down. Procurement wants a license number and a certificate of insurance. A good scope answers all three in writing before the first shift.

Fire safety is shared too. NFPA’s fact sheet on NFPA 241, the standard for safeguarding construction, alteration and demolition operations, says a building owner with a project under construction must have a fire prevention program manager, and contractors on site must follow that manager’s direction. If your project has one, line the security scope up with their program.

How jobsite exposure changes from phase to phase

NFPA’s construction fire safety guidance names conditions that apply on many projects:

  • Fire protection is incomplete. Sprinklers, smoke detection and fire alarms may not be installed or working yet.
  • Sites are often unsecured. Trespass can lead to vandalism, theft and intentionally set fires.
  • Ignition sources are common. Temporary heaters and hot work such as welding, cutting, grinding, soldering and roofing all carry fire risk.
  • The risk does not stop at quitting time. NFPA says construction sites must be safeguarded around the clock, not only while work is going on.

What needs watching also shifts with the phase. During rough-in, wire, fittings and loose material can sit exposed overnight. After dry-in, tools and installed equipment become the concern. Deliveries dropped outside the fence on a weekend are effectively unattended, and heavy delivery weeks put pressure on the gate.

Where unarmed officers, gate control, patrols and fire watch fit

NESF officers are unarmed. Their job is to be present, control access, observe, document and escalate. On a jobsite that work falls into four services:

Service What it covers on a jobsite
Gate and access control Checking arrivals against the approved subcontractor and delivery list, logging company, trade, vehicle and times, and holding unexpected visitors for an escort.
Construction site security An officer on post after hours and on weekends, watching laydown areas, equipment and the perimeter.
Patrols Walking the site to check fence panels, gates, ladders and areas named in the post orders, and recording what they find.
Fire watch A dedicated officer watching for fire while systems are impaired or after hot work, staffed to the fire official’s or permit’s requirements.

For targeted problems, see copper theft deterrence, equipment security and material security. For a short gap in coverage, see temporary security. NESF provides officers only. We do not install cameras or alarm systems.

Fire watch and the Virginia and federal rules behind it

Whether a construction fire watch is needed, and how it runs, comes from the codes, the local fire official and, for hot work, the permit terms. A security company does not set it.

  • Virginia Statewide Fire Prevention Code. It amends Chapter 33 of the International Fire Code, which covers fire safety during construction and demolition. Among other things, it requires approved firefighting vehicle access to construction sites and requires a standpipe, where the building code calls for one, to remain operable.
  • Virginia Uniform Statewide Building Code. The Virginia Construction Code has its own construction-safeguards chapter, including standpipe and water supply provisions for buildings under construction.
  • NFPA 25. When a water-based fire protection system is impaired, an approved impairment program must be in place until it is restored.
  • NFPA 51B. The standard for fire prevention during welding, cutting and other hot work. Where a hot work permit calls for a fire watch, follow its terms.
  • OSHA 29 CFR 1926. The employer must have a fire protection program followed through all phases of the work. Under 1926.352, when normal precautions are not enough, extra personnel must be assigned to guard against fire during welding or cutting, and they must be instructed on the expected hazards and the firefighting equipment provided.

The fire official or authority having jurisdiction decides whether a watch is required, how often rounds are made, what area is covered and what records are kept. Get those instructions first. NESF then staffs the watch to them. Our guides on how fast fire watch can start and how many fire watch officers you need walk through the planning questions.

What to have ready before you request coverage

  1. Site address, gate locations and which gates will be staffed or locked.
  2. The schedule for the coming phase, including delivery windows and weekend work.
  3. The approved subcontractor and delivery list, and who can add names to it.
  4. The site logistics plan showing laydown areas, equipment zones and temporary structures.
  5. Site orientation and PPE requirements officers must meet before going on post.
  6. The superintendent’s after-hours number and a backup escalation contact.
  7. Any standpipe or sprinkler impairment dates, plus the fire official’s written fire watch instructions or the hot work permit terms.
  8. Hours, days and expected duration of coverage, and who should receive shift reports.

How NESF staffs a general contractor’s site

  • Unarmed, uniformed officers under Virginia DCJS license #11-6371. Virginia law requires a DCJS license to operate a private security services business.
  • Written post orders covering duties, report recipients, emergency contacts and site restrictions, agreed before coverage begins.
  • Written shift reports and logs.
  • Fire watch staffed to the fire official’s instructions.
  • A certificate of insurance on request. See licensing and compliance and procurement information.

When coverage can start depends on the site’s location and officer availability. We will tell you plainly what we can staff.

Request jobsite coverage

Send the site address, gate details, dates, hours and an escalation contact through the contact form, call 703-869-6213 (answered 24/7), or email info@nesf.us.

Related services: General contractor security program · Hiring site security as a general contractor

General contractor jobsite questions

Does a standpipe or sprinkler impairment during construction automatically require a fire watch?

Not automatically. The local fire official or authority having jurisdiction decides whether a fire watch is needed, how often rounds are made, what area is covered and what records are kept. Get those instructions first, and NESF will staff the watch to them.

Are your officers armed?

No. NESF provides unarmed, uniformed officers only. On a jobsite they control the gate, patrol, observe, document and escalate to your named contacts and to emergency services when needed.

Can your officers run our gate and check subcontractors in?

Yes. Officers can check arrivals against your approved subcontractor and delivery list, log company, trade, vehicle and times, and hold unexpected visitors for an escort, as set out in written post orders you approve.

What paperwork do you provide for procurement?

Our Virginia DCJS license number (#11-6371), a certificate of insurance on request, written post orders agreed before coverage begins, and written shift reports.

From a phone call to an officer on post.

  1. Tell us the site The site, the hours, the gates, and what needs eyes on it.
  2. Post orders and rate Duties, patrol pattern and rate confirmed in writing up front.
  3. Officers on post Officers on post, activity logged, escalation to your named contact.

Coverage is scheduled around the site, the hours and officer availability.

Coverage request

Request coverage for this site

Tell us the site, the hours you need covered and when it starts. If the coverage is needed today, calling 703-869-6213 is faster than this form.

Required field

Call 703-869-6213 instead
  • Virginia DCJS #11-6371 · unarmed uniformed officers
  • Written site-specific post orders and documented reporting on every shift
  • Requests taken at any hour, including nights, weekends and holidays
  • Used only to answer this request — privacy policy

If there is an active emergency or an immediate threat to life, contact the public emergency services first.